now two main beams, and trial layout of crossmembers
ram now trial fitted with correct sized bolts
small offcut of side bodywork shows depth loadbed will be on top of the loadbed frame
quite a bit of extra wiring to add
Lower mounts for the lifting rams tack welded into place to check positioning
Rams in position for checking before final welding. Looking ok.
hinge mockup to test the design
partway open
open
frame going together
designing rear quarter panels