Rounding up and then blocking up an ash tree removed on a building site
the Logrovers built in splitter came in handy (we didn't expect to be splitting this time) and lowering to the ground helped avoid too much heavy lifting
a healthy Logrover and trailer load - almost all fitted in...
driving off on a very cold morning, just as the sun was rising
time to remove that ash we'd felled a weeks earlier
the start of a nice day
first section on the move...
it will fit...
first half loaded in, but no room for the second half whole, so need to slice and dice
some slices
and dices
lifting tongs loaded a few slices whole
and the leftover dices loaded in the Logrover
got in all in between us
job done.
went back a couple of months later to chip up the branches
soon reduced the pile
decided to catch some of the chips in the logrover
job done
felling and winching down a few large pine trees between houses
all landed where they needed to
another weekend, another use for the logrover. Being used here to add an extra bit of height for some long distance pole sawing...
all safely of course...
doing some work on a building site
clearing a couple of those trees behind the soil bank - so tricky access
but able to squeeze the Logrover in between the bank and stream