Up one level The Log Rover Project » Log Rover in use
Log Rover in use
Actually getting to use it after a couple of years building it...

Previous page Next page 481-512 (of 722 found)
 and a new trailer...

and a new trailer...

 with timber crane...

with timber crane...

 practising

practising

 time to put to use

time to put to use

 shifting lengths around now very easy

shifting lengths around now very easy

 loading a lot quicker

loading a lot quicker

 no using strops and chains any more for bundles

no using strops and chains any more for bundles

 very precise to pick up just what you want from the pile

very precise to pick up just what you want from the pile

 then spin around for loading

then spin around for loading

 filling up

filling up

 a

a "trailer load" now needs to be recalibrated...

 stable on the road

stable on the road

 time to unload

time to unload

 jobs a good 'un.

jobs a good 'un.

 early, dark, cold, snowing, and a windblown beech to clear up on a local estate

early, dark, cold, snowing, and a windblown beech to clear up on a local estate

 an hour or so later and all tidied up for loading and chipping

an hour or so later and all tidied up for loading and chipping

 crane time

crane time

 no problems at all with these lengths

no problems at all with these lengths

 all the brush chipped up and most of the logs loaded

all the brush chipped up and most of the logs loaded

 will need to come back for the rest

will need to come back for the rest

Page 16 of 23 Next page