Up one level The Log Rover Project » Log Rover in use
Log Rover in use
Actually getting to use it after a couple of years building it...

Previous page Next page 129-160 (of 722 found)

 splitting site - right in the middle, worked out well.

splitting site - right in the middle, worked out well.

 The next weekend - taking a load of the oak.

The next weekend - taking a load of the oak.

 Jack taking a rest from helping with the stacking

Jack taking a rest from helping with the stacking

 8am on a foggy saturday, starting to clear a windblown beech tree which had been left by someone else as it was too large for them clear...

8am on a foggy saturday, starting to clear a windblown beech tree which had been left by someone else as it was too large for them clear...

 first cut

first cut

 handy things Unimogs with cranes....

handy things Unimogs with cranes....

 we later weighed that

we later weighed that "log" on the weighbridge, 2.5 tonnes (thats just the log!)

 taking a slice this time

taking a slice this time

 making chips

making chips

 once sliced, lowered the log splitter to its ground setting, and just about managed to lever the slice onto the footplate

once sliced, lowered the log splitter to its ground setting, and just about managed to lever the slice onto the footplate

 no worries

no worries

 quite big really

quite big really

 looking happy, as having a splitter on the ground means we don't have to lift these huge rounds!

looking happy, as having a splitter on the ground means we don't have to lift these huge rounds!

 first round was all split up and in the loadbed, and this was the second round being split

first round was all split up and in the loadbed, and this was the second round being split

 That was the Logrover full (later weighed at 680kg of logs) from just two rounds of that trunk. Still a few rounds left to go for another day.

That was the Logrover full (later weighed at 680kg of logs) from just two rounds of that trunk. Still a few rounds left to go for another day.

 A good couple of hours work.

A good couple of hours work.

 another early morning start - following through the Unimog-fog. Heading off to the forest in the centre of the photo

another early morning start - following through the Unimog-fog. Heading off to the forest in the centre of the photo

 to remove these six dead elm trees overhanging some driveways

to remove these six dead elm trees overhanging some driveways

 positioning the Log-Rover to use a rope to keep the tension on the tree (via a pulley secured behind the camera in this pic) whilst felling - worked a treat.

positioning the Log-Rover to use a rope to keep the tension on the tree (via a pulley secured behind the camera in this pic) whilst felling - worked a treat.

 First three elms down and logged up

First three elms down and logged up

 all down and tidied up in a morning (with no damage). Will have to return to uplift logs and do some splitting.

all down and tidied up in a morning (with no damage). Will have to return to uplift logs and do some splitting.

 That mass of growth is an an overgrown beech hedge which we've been asked to

That mass of growth is an an overgrown beech hedge which we've been asked to "prune"

 the hedge runs behind these sheds and is about 20ft high rather than 3ft.

the hedge runs behind these sheds and is about 20ft high rather than 3ft.

 tidied up the rear branches and the ground debris so we could get at the trees

tidied up the rear branches and the ground debris so we could get at the trees

 some hours later, and sunlight can now enter. half the trees pruned to 3ft high, all the twiggy stuff moved away, and the useful timber cut and stacked

some hours later, and sunlight can now enter. half the trees pruned to 3ft high, all the twiggy stuff moved away, and the useful timber cut and stacked

 after the clearup was able to drive the log rover in and split a load

after the clearup was able to drive the log rover in and split a load

 half the hedge done, rest to do tomorrow

half the hedge done, rest to do tomorrow

 The next day, and returning to finish the job

The next day, and returning to finish the job

 Rigging up the first leaner - capstan winch came in very handy as was used on nearly every tree

Rigging up the first leaner - capstan winch came in very handy as was used on nearly every tree

 A few already down, and now just rigging up the last ones

A few already down, and now just rigging up the last ones

 All down, and just some clearing up with a bit of logging and splitting to end the day

All down, and just some clearing up with a bit of logging and splitting to end the day

Page 5 of 23 Next page