perfect clearance when ram fully extended - just enough to chop your finger off but leave enough skin so it doesn't drop on the floor...
12.9 grade high tensile bolts on the left are the ones we'll be using
the wedge is blurred because it's moving!!! using some compressed air rather than hydraulic fluid we got the ram working (but a bit jerky due to the air)
shows the lifter plate below
trial run assembly
designing how it will be locked in position and will lower to the ground
going to be tight fitting a locking mechanism in there
this is its normal working height, with ram fully extended
tight fit
this it lowered almost to the deck for ground level splitting
locking mechanism finally designed and built - two tubes, a hole, a pin and a securing clip
locking pin passes right through beam and two tubes and retained with an R clip
may need to enlargen the hole if alignment becomes tricky
another dark saturday night working - this time assembling the beam with its locking pin - so here can be seen in the actual stored position
stowed
tipped up hydraulically (for the first time) into default splitting position
normal splitting position
can see end of locking pin holding the beam up vertically
experimenting with chain for lowering mechanism
It's finally assembled and home. Welding done, plumbed in and ready for testing.
Notice protection hoops over fittings and support post for storage
Final hoses made up and plumbed in.
Notice strengthener bars under bottom plate and hose retaining rod between beam and cab.
fully erect at the flick of a lever...
will it work?
of course
didn't bother it at all (but it is dry larch wood).