Up one level The Log Rover Project » Putting things together
Putting things together
This is the bit that takes the time, but looks good (for a while at least)

Previous page Next page 161-192 (of 402 found)
 On the quarry weighbridge - weighed in at 1.93 tonnes, without the log splitter or any load...

On the quarry weighbridge - weighed in at 1.93 tonnes, without the log splitter or any load...

 alongside some potential spares at the quarry

alongside some potential spares at the quarry

 designing the log splitter - so far just the ram and a salvaged beam

designing the log splitter - so far just the ram and a salvaged beam

 Bernie using the gas axe to cut up some 20mm plate to make the top mounts

Bernie using the gas axe to cut up some 20mm plate to make the top mounts

 more designing of how the ram will be mounted and the dimensions of the cutting knife. New lathe in the background.

more designing of how the ram will be mounted and the dimensions of the cutting knife. New lathe in the background.

 drilling out the top mounts using the pillar drill

drilling out the top mounts using the pillar drill

 Using a cutting tool to make the 35mm holes in the fabricated top mounts

Using a cutting tool to make the 35mm holes in the fabricated top mounts

 Using the lathe to easily drill out 25mm holes inside some 35mm bar to make up adaptor pieces for the cutting tool

Using the lathe to easily drill out 25mm holes inside some 35mm bar to make up adaptor pieces for the cutting tool

 Top mounts, mounting pin (to be shortened), and strengthening box below - all ready for welding up next time

Top mounts, mounting pin (to be shortened), and strengthening box below - all ready for welding up next time

 Once top mounts are welded in place, they are cleaned up

Once top mounts are welded in place, they are cleaned up

 Top mounts and strengthening box sections welded in place

Top mounts and strengthening box sections welded in place

 beam cleanup and holes plugged - will be cut down to size once stroke of ram and blade are known

beam cleanup and holes plugged - will be cut down to size once stroke of ram and blade are known

 Slider made up and designing the cutting wedge

Slider made up and designing the cutting wedge

 not sure of this open top wedge design yet

not sure of this open top wedge design yet

 time to unravel a manila winch rope

time to unravel a manila winch rope

 and then construct a Back splice and an Eye splice (with the help of a book and a tin of Export...)

and then construct a Back splice and an Eye splice (with the help of a book and a tin of Export...)

 So this is going to be a one-man vehicle then once all the chainsaw gear is loaded up....

So this is going to be a one-man vehicle then once all the chainsaw gear is loaded up....

 another friday night in the shed - this time making the splitter wedge - second design

another friday night in the shed - this time making the splitter wedge - second design

 up close welding

up close welding

 revised splitter wedge before tidying

revised splitter wedge before tidying

 and this is the wedge cleaned up after about two hours with various grinders

and this is the wedge cleaned up after about two hours with various grinders

 Couldn't drill or saw the hardened steel ram pins, so used a tungsten carbide parting tool in the lathe to cut down to size

Couldn't drill or saw the hardened steel ram pins, so used a tungsten carbide parting tool in the lathe to cut down to size

 The carbide tool cut through the pins very effectively

The carbide tool cut through the pins very effectively

 another friday night, this time with a 2am finish- welded the wedge to the slider with ram mounts, shortened two pins - took 6 hours...

another friday night, this time with a 2am finish- welded the wedge to the slider with ram mounts, shortened two pins - took 6 hours...

 shortened pin in place - still need to add locking bolt on other side

shortened pin in place - still need to add locking bolt on other side

 wedge welded to slider, pin mounts made and drilled, and hardened pin shortened to length

wedge welded to slider, pin mounts made and drilled, and hardened pin shortened to length

 still need to add pin securing bolt

still need to add pin securing bolt

 need to tidy up knife front at the base still

need to tidy up knife front at the base still

 knife now welded at front and tidied up with various grinders and flap discs

knife now welded at front and tidied up with various grinders and flap discs

 should be sharp enough......

should be sharp enough......

 don't think it will break quickly - still need to design and make a pin retaining mechanism

don't think it will break quickly - still need to design and make a pin retaining mechanism

Page 6 of 13 Next page